该【2025年工厂检查调查表 英文 】是由【业精于勤】上传分享,文档一共【10】页,该文档可以免费在线阅读,需要了解更多关于【2025年工厂检查调查表 英文 】的内容,可以使用淘豆网的站内搜索功能,选择自己适合的文档,以下文字是截取该文章内的部分文字,如需要获得完整电子版,请下载此文档到您的设备,方便您编辑和打印。编号:
时间:x月x曰
书山有路勤为径,学海无涯苦作舟
页码:
Factory code:
Questionnaire for Factory Inspection
Name of Applicant:
Name of Manufacturer:
Name of Factory:
China Quality Certification Center
编号:
时间:x月x曰
书山有路勤为径,学海无涯苦作舟
页码:
Name of the factory:
Address of the factory:
Tel: Fax: Post Code:
E-mail:
The Optimal route to factory [local Railway station, airport (with the map if possible)]
Name of the manufacturer:
Address of the manufacturer:
Tel : Fax: Post Code:
E-mail:
Name of the applicant:
Address:
Tel: Fax: Post Code:
E-mail:
Contact person of certification: Department/position: Tel:
编号:
时间:x月x曰
书山有路勤为径,学海无涯苦作舟
页码:
The name, department/position and telephone of principal on quality assurance
Name of the principal: Department/position: Tel:
Total amount of employees in the factory (If the production for the certified product is just one part of the whole production, please indicate the amount of employees for the production and management on the products applied for certification)
The application No., name, model /specification and trade mark of the products applied for certification
Pursuant standards of the products applied for certification
Has the factory established and maintained a documented quality system according to the requirement of the implementation rules for certification? Provide ①the chart of organization structure ②the list of the quality manual ③the list of the documented procedures .
Indicate t
编号:
时间:x月x曰
书山有路勤为径,学海无涯苦作舟
页码:
he production process on the products applied for certification, which is performed by factory.
(Please provide the production flow chart, and fill in the Appendix 1-- List of Key Production Equipments.)
Indicate the critical parts and materials, which are provided by the subcontractors.
(Please give clear indication if the parts have passed the CCC or other equivalent product certifications.)
To ensure that the final products conform to corresponding standards, please specify on which items the factory has inspection ability during in-coming inspection, process inspection and final inspection. (Please provide a list of inspection documents and fill in Appendix2-- List of Main Test Instruments and Equipments).
Please indicate the Certificates and the Marks been got by the products for which the Certification have being applied.
编号:
时间:x月x曰
书山有路勤为径,学海无涯苦作舟
页码:
Whether or not the factory has obtained the certificates of quality system certification (please provide the copy of the certificates) and indicate the date and conclusion of last audit).
Date of factory inspection expected:
Off day of factory: Time of factory on/off duty:
Whether or not the inspection could be done on off day:
yes discussible no
Whether or not the inspectors of Certification Body are allowed to access all sites for production and management on products applied for certification under consulting with quality principal during regular production?
Signature and stamp of the representative of the factory:
Date:
编号:
时间:x月x曰
书山有路勤为径,学海无涯苦作舟
页码:
Note: The undersigned person shall be responsible for the veracity of the information filled in this questionnaire.
编号:
时间:x月x曰
书山有路勤为径,学海无涯苦作舟
页码:
Appendix 1
List of Key Production Equipments
Name of factory: page of
No.
Name of equipment
Manufacturer
Main technical parameters
Quantity
Location
编号:
时间:x月x曰
书山有路勤为径,学海无涯苦作舟
页码:
编号:
时间:x月x曰
书山有路勤为径,学海无涯苦作舟
页码:
Appendix 2
List of Main Test Instruments and Equipments
Name of factory: page of
No.
Name of instruments & equipments
Manufacturer
Measure scope
Precision
Quantity
Location
编号:
时间:x月x曰
书山有路勤为径,学海无涯苦作舟
页码:
2025年工厂检查调查表 英文 来自淘豆网m.daumloan.com转载请标明出处.