22-PCE-QP-PJT-02.doc


文档分类:管理/人力资源 | 页数:约3页 举报非法文档有奖
1/3
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/3
文档列表 文档介绍
PYRAMID CONSTRUCTION ENGINEERING ( PTE ) LTD
QUALITY PROCEDURE
DOC. NO. : PCE-QP-PJT-02
REV. : A
SHEET : 1 OF 3
EFFECTIVE DATE – 18/10/97
TITLE: CUSTOMER SUPPLIED PRODUCT
Rev. #
Description of Change
Clause #
A
Initial Release
.
Prepared By
MANAGER, CONSTRUCTION DEPT
(Signature) (Designation) (Date)
Reviewed By
MANAGER, CONSTRUCTION DEPT
(Signature) (Designation) (Date)
Approved By
MANAGEMENT REPRESENTATIVE
(Signature) (Designation) (Date)
PYRAMID CONSTRUCTION ENGINEERING ( PTE ) LTD
QUALITY PROCEDURE
DOC. NO. : PCE-QP-PJT-02
REV. : A
SHEET : 2 OF 3
TITLE: CUSTOMER SUPPLIED PRODUCT
Purpose: To define a procedure for verification, storage and maintenance of Customer Supplied Products provided for incorporation into the supplies.
Scope: This procedure applies to the Construction Department.
Reference: Nil
Responsibility
The responsible department or end user shall have main responsibility to ensure a systematic approach for verification, storage and maintenance of Customer Supplied Products.
Procedure:
Verification of Customer Supplied Product
Upon receipt of the customer supplied product, the responsible department or end user shall ensure the requirements are clearly defined and in accordance with conditions / requirements as provided by customers.
The Foreman shall raise and issue the “Customer Information Sheet” and feedback to custom

22-PCE-QP-PJT-02 来自淘豆网m.daumloan.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息