下载此文档

ERP实施过程.ppt


文档分类:管理/人力资源 | 页数:约28页 举报非法文档有奖
1/28
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/28 下载此文档
文档列表 文档介绍
Lesson 30
Text Watch keeping(值班)
2001-03-25
At the beginning of the watch the current operational parameters and the condition of all machinery should be verified and also the log readings should correspond with(be in agreement with) those observed.
2001-03-25
The engineer officer in charge(on duty) should note if there are any special orders or instructions relating to the operation of the main machinery or auxiliaries. He should determine what work is in progress and any hazards(dangers) or limitations it presents.
2001-03-25
The levels of tanks containing fuel, water, slops, ballast, etc., should be noted and also the level of the various bilges. The operating mode of equipment and available standby equipment should also be noted.
2001-03-25
At appropriate intervals(. at 30-minute intervals) inspection should be made of the main propulsion plant, auxiliary machinery and steering gear spaces. Any routine adjustments may then be made and malfunctions or breakdowns can be noted, reported and corrected.
2001-03-25
During these tours of inspection bilge level should be noted, piping and systems should be observed for leaks, and local indicating instruments also be observed.
2001-03-25
Bridge orders must be promptly(迅速地) carried out and a record of any required changes in speed and direction should be kept. When under standby or maneuvering conditions with the machinery being manually operated the control unit or console should be continuously manned.
2001-03-25
Certain watchkeeping duties are necessary for the continuous operation of equipment or plant-the transferring of fuel for instance. In addition to these regular tasks other repair or maintenance tasks may be required of the watchkeeping personnel.
2001-03-25
However no tasks should be undertaken which will interfere with the supervisory(管理的、监督的) duties relating to the main machinery and associated equipment.
2001-03-25
During the watch a log or record will be taken of the various parameters

ERP实施过程 来自淘豆网m.daumloan.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息
  • 页数28
  • 收藏数0 收藏
  • 顶次数0
  • 上传人mkjafow
  • 文件大小1.60 MB
  • 时间2018-05-02
最近更新