下载此文档

BPDM+Section05(英文版).doc


文档分类:文学/艺术/军事/历史 | 页数:约34页 举报非法文档有奖
1/34
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/34 下载此文档
文档列表 文档介绍
SECTION 5 – ENGAGEMENT TYPE 2: STRATEGIC DESIGN
STRATEGIC DESIGN
The aim of strategic design is typically to significantly change the business process in one or more business units or functional areas. Capability elements may also be considered at points where they directly impact the business process. The engagement is staffed with a small team of practitioners who work on it for the entire duration. (Figures , )
Figure Strategic Design Activity Sets
Figure Strategic Design Engagement Lifecycle
ACTIVITY SET – SET COURSE
The primary objective for this activity set is to develop the Statement of Work (SOW) for the engagement. The primary source of information for the Set Course activity set is the client sponsor(s) and persons they designate. All of the activities in this activity set are important and all of them should pleted. The typical duration for this activity set for a Strategic Design Engagement is between one and two weeks. The sequence of activities is not rigid and actually much of the work can be done concurrently.
Activity – Draft Statement of Work
The primary objective here is to begin with the end in mind. The development of the SOW should begin as soon as the engagement type selection is made. It is always developed in close association with the client sponsor and persons they designate. It is mended that the practitioner draft a preliminary SOW very quickly and introduce the sponsor to ponents. It is also mended that all consultants involved in the engagement e familiar with the SOW early on.
The importance of the SOW can not be overstated. It is the foundation for everything es after, it sets expectations and will continue to be a key reference through the engagement. The SOW is often a part of the engagement letter or the format may be specified in the master services agreement we have with the client. Though it is an engagement management tool and not a major deliverable, it is appropriate to treat it like one. Se

BPDM+Section05(英文版) 来自淘豆网m.daumloan.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息
  • 页数34
  • 收藏数0 收藏
  • 顶次数0
  • 上传人593951664
  • 文件大小1.94 MB
  • 时间2018-08-13
最近更新