关键字城市轨道交通总承包工程投标报价策略 THE RESEARCH OF TENDER STRATEGY FOR SHANGHAI UMT LINE N’S POWER SYSTEM PROJECT
ABSTRACT
Shanghai Urban Mass Transit(UMT) Line N is a high speed subway connecting Songjiang New Town with downtown. It will provide resident a most convenient in-and-out way, also develop Songjiang New Town to receipt more and more center downtown population of Shanghai. Shanghai UMT Line N construction project is divided into several programs (contracts), among them the Power System offering traction power for subway train, providing electricity power for lights, Ad, and pumps. It applies project general contract model to invite public bidding. Firstly, This thesis analyzed the basic meaning of bidding on construction project in China. Based on construction project bidding theory, The thesis expatiated concept of bidding contract system, bidd