下载此文档

工厂品质改善团队.ppt.ppt


文档分类:管理/人力资源 | 页数:约15页 举报非法文档有奖
1/15
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/15 下载此文档
文档列表 文档介绍
QIT-Enhance Material & PCBA Quality Control in PCP Stage 优产先锋
Date: 24-08-2012 (Version )
Opportunity
During PCP/NPI stage, the quality of material & PCBA boards are not stable:
Average performance indicator
- For material is 4627ppm,
- For PCBA is 3259ppm .
Objective & Scope
Objective:
During PCP/NPI stage reduce material Fall Off Rate from 4627ppm to 2000ppm.
During PCP/NPE stage reduce PCBA Fall Off Rate from 3259ppm to 2000ppm and ultimate achieve the aim 900ppm.
Scope:
Develop and formalize current quality control process in PCP stage to achieve high quality performance of new product.
To try run on new model HTS9800, YDVS661 and MDVSC6001.
Planning Schedule:
D
P
A
C
QIT Improvement Schedule
Causes & Effect Analysis
Process
Methods
Materials
Design
加胶水不均匀
固定机板胶水沾力不够
IQC抽检积架复盖率低
IQC抽检内容不规范
6P排线加工后无测试
复位开关变形
CD眼固定钢丝变形
无工位检查外观
24P插座脚与皮线之间脱离
包装方法不正确
Cannot read disc
DVDRW cannot upgrade
滑动马达齿轮配合太紧。
DVDRW cannot record
Tray cannot open
D
P
A
C
Actions – for Material - Develop & Formalize Operation Process Definition
D
P
A
C
Actions – for Material - Develop & Formalize Operation Process Flow
D
P
A
C
Actions – for Material - Develop & Formalize Operation Process Flow Inidcator
D
P
A
C
Actions – for PCBA - Develop & Formalize Operation Process Definition

工厂品质改善团队.ppt 来自淘豆网m.daumloan.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息
  • 页数15
  • 收藏数0 收藏
  • 顶次数0
  • 上传人tuhhhpo
  • 文件大小0 KB
  • 时间2015-09-16