总价合同,工程计量
篇一:单价合同与总价合同的工程价款调整分析
单价合同与总价合同的工程价款调整分析
10工程(2)班卢青阳
【摘要】:单价合同与总价合同是合同价款支付的两种不同计价方式,本文通过阐述单价合同与总价合同的定义直观展示了它们的特点、使用条件和存在价值。本文根据江苏省相关建筑规范及法规文件和GB50500-XX建设工程工程量清单计价,阐明了合同中约定价款调整方式的重要性。同时本文还通过各种案例综合结合清单规范分析了价款结算对于甲乙双方的利害关系,以相关法律条文及表格等形式定性给出结论。
【关键词】:工程量清单;工程量缺项;工程量变更;价格争议;附加工程;工期拖延
Analysis of fixed price contract with fixed price contract price
adjustment
Abstract:Unit price contract is a contract with two different pricing contract price paid, this paper describes the definition of the total price of the contract price contract with visual display their characteristics, conditions of use and existence value. According to Jiangsu Province, building codes and regulations relevant documents and GB50500-XX construction of the Bill of Quantities, to clarify the importance of the price agreed in the contract to adjust the way. Same article also lists a variety of binding norms prehensive analysis of the price settled at stake for both parties to the relevant legal provisions and tables and other forms of qualitative conclusions are given.
Keywords: BOQengineering missing itemsengineering changesprice dispute additional engineeringschedule delays
目录
摘要i Abstract ii
一、定义1
(一)单价合同 1
(二)总价合同 1
二、计量支付方法2
(一)单价合同的计量支付2
(二)总价合同的计量支付6
三、价款调整方法7
(一)总的原则7
(二)总价合同的价款调整8
(三) 单价合同的价款调整11
四、结语15 参考文献15 致谢16
一、定义
在实际工程中,合同计价方式有近20种。不同种类的合同,有不同的应用条条件、不同的权利和责任分配、不同的付款方式,对合同双方有不同的风险。应按照具体情况选择合同类型。有时在一份工程工程承包合同中,不同工程分项采用不同的计价方式。最典型的合同类型有:
(一)单价合同
单价合同的特点是单价优先,业主在招标文件中给出的工程量表,它通常是按照规定的工程量清单编制方法编制的。但其中的工程量是参考数字,实际合同价款按实际完成的工程量和承包商所报的单价计算。单价合同又分为固定单价和可调单价等形式。
这是最常见的合同类型,使用范围为广,FIDIC施工合同和我国的建设工程施工合同都属于该类合同。承包商仅按合同规定承担报价的风险,即对报价(主要为单价)的正确性和适宜性承担责任,而工程量变化的风险由业主承担。由于风险分配比较合理,能够适应大多数,能调动承包商和业主双方的管理积极性。根据《建设工程施工合同(示范文本)》(GF-XX-0201)的内容,单价合同的定义是“指合同当事人约定以工程量清单及其综合单价进行合同价格计算、调整和确认的建设工程施工合同,在约定的范围内合同单价不作调整。合同当事人应在专用合同条款中约定综合单价包含的风险范围和风险费用的计算方法,并约定风险范围以外的合同价格的调整方法,其中因市场价格波动引起的调整按第款〔市场价格波动引起的调整〕约定执行。”[1]
(二)总价合同
总价合同以一次包死的总价格委托,除了设计有重
总价合同,工程计量 来自淘豆网m.daumloan.com转载请标明出处.