:..土方开挖专项方案编制:审核:审批:2013年2月22日目录一、编制依据...................................................2二、工程概况...................................................21、基坑概况.................................................22、基坑工程特点.............................................33、工程地质情况.............................................34、工程水文情况.............................................4三、施工准备...................................................4四、施工工艺技术...............................................51、土方开挖施工.............................................62、喷射混凝土...............................................93、喷锚支护部分铺设钢筋网...................................9五、施工进度..................................................12六、施工总平面布置图..........................................12七、施工安全保证措施..........................................121、质量保证措施............................................132、安全防护及文明施工措施..................................143、环保措施................................................144、基坑现场围护情况及安全保证措施..........错误!未定义书签。5、基坑监测................................................156、应急措施................................................161一、编制依据1、勘察地质报告。2、基坑支护设计图纸、规划坐标图、地下室总平定位图;3、施工组织设计;4、选用规范1)、《建筑地基基础设计规范》(GB50007-2002)2)、《混凝土结构设计规范》(GB50367-2006)3)、《建筑地基基础工程施工质量验收规范》(GB50202-2002)4)、《混凝土结构工程施工及验收规范》(GB50204-2002)5)、《建筑基坑支护技术规程》(JGJ120-99)6)、《建筑与市政降水工程技术规范》(JGJ/T111-98)7)、《建筑地基处理技术规范》(JGJ79-2002,J220-2002)8)、《建筑基坑工程监测技术规范》(GB50497-2009)9)、适用于本工程的国家其他现行规范、规程等。二、工程概况1、基坑概况拟建的社会保障大楼有主楼和附属楼组成,主楼1幢,附属楼共计22,,地下室一层建筑面积为幢。总建筑面积22。(±,),地下室大面积底板垫层底标高为-()。本工程采用水下混凝土灌注桩,共65根,其中直径为Φ800的35根,直径为Φ1000的12根,直径为Φ1200的18根。22、基坑工程特点1)、基坑面积小,场地小。㎡,,。因无堆放土方的场地,开挖的土方全部外运。2)-,。。为保证基坑边坡支护稳定性,土方开挖工程需尽可能在短的时间内完成,因此必须加大人力、设备的投入量,并采取先进的施工工艺,性能良好的专用大型设备和完善的技术保证措施,方能保证工程总工期的要求。3)、施工现场地处水南镇三华大道边有居民、行人通过,北西、北东边为空旷地,南东有一座3
深基坑支护方案 来自淘豆网m.daumloan.com转载请标明出处.