莫公共厕所改造工程
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured2
1
目 录
1 概述
2 施工方法、施工工艺
3 主要设备计划
4 主要材料及构件用量计划
5 劳动力计划安排
6 施工总进度计划(总体工程及各分项工程施工进度横道图、网络图)
7 基础、主体、装修施工平面布置图及道路平面图
8 针对不同施工阶段特点的技术措施
9 质量管理体系
10保证优质工程措施
11降低成本措施
12冬季、风季、雨季施工措施
13保证总工期和分部工程工期的措施
14 安全生产措施
15 文明施工措施
16 施工工地防火管理措施
17 针对本工程结构特点的技术措施
18 环境保护措施
我公司对本工程施工组织设计的编制高度重视,按照建设单位招标会通知精神和内容要求,召集了参加过类似工程施工、有丰富管理及施工经验的人员,在仔细研究图纸,明确工程特点、充分了解施工环境、准确