2020 年 10 月 图 学 学 报 October 2020
第 41 卷 第 5 期 J cross-file connection breakpoints, misaligned connections, and
wrong connection directions. The method for automatic inspection and repair was proposed to fix
the problem of the large number of missing physical connections commonly found in existing
BIM models. The implementation of this method in projects supported the rapid conversion of the
BIM model from construction to operation & maintenance, which was conducive to the
implementation of the BIM-based operation & maintenance management of the
electromechanical system.
收稿日期:2020-04-28;定稿日期:2020-07-07
Received:28 April,2020;Finalized:7 July,2020
基金项目:上海市青年科技英才扬帆计划项目(18YF1410400);上海市启明星课题(18QB1402300)
Foundation items:Shanghai Sailing Program (18YF1410400); Shanghai Rising-Star Program (18QB1402300)
第一作者:许璟琳(1989),女,福建漳州人,工程师,硕士。主要研究方向为计算机辅助建筑物运维管理。E-mail:******@
First author:XU Jing-lin (1989–), female, engineer, master. Her main research interests cover computer-aided building operation and maintenance
management. E-mail:******@
万方数据834 建筑与城市信息模型 2020 年
Keywords: building information modeling; electromechanical devi
建筑机电系统物理连接关系自动修复方法 来自淘豆网m.daumloan.com转载请标明出处.