word
word
2 / 30
word
OBJECTIVE / PURPOSE
This document provides a set of guidelines for the introduction of e of higher quantities for high volume products such as telephones.
These units are sometimes used by design engineering, marketing, and software development. The units are typically non-revenue generating for the customer.
DV – Design Validation
DV Units are in the final design and fully debugged form. The form factor is finalized. Units are used for final validation testing of the product for conformance to design and product specifications.
word
word
4 / 30
word
These units are often built on a prototype line or NPI center, but should be run on the same type of line that volume production will be using. The build quantity is determined through mutual agreement with the customer, but is often less than 100, and may be much higher for products such as telephones.
These units are typically allocated to design engineering, quality engineering, test engineering, manufacturing engineering, software development, and marketing, and may be subjected to destructive level testing.
The units, often called the Prototype Run, are typically non-revenue generating for the customer. Conclusion of this phase may involve a review meeting with the customer and typically a report is provided summarizing the results.
PV – Process Validation
PV Units are the final, customer ready units built on the designated production line in the selected production facility to validate the production process, determine process baselines for SPC, test yields, etc. and identify improvement opportunities.
The build quantity is determined through mutual agreement with the customer, but can often be greater than 100.
PV units, often called the Pilot Run, are typically revenue generating for the customer. Conclusion of this phase typically involves pletion of some bination of the following based on customer requirements: a mutually agreed
New Product Introdution (NPI) Guidelines-新产品引进指导 来自淘豆网m.daumloan.com转载请标明出处.