several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured13
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
方可开工。未经市政府批准,项目不得开工,有关部门不得批准招投标,不得发放施工许可证,财政部门不得拨付资金。
项目主管部门报送财政性投资项目开工报告应包含下列内容:
(一)开工项目名称、建设规模、项目总投资、投资效益、资金来源、建设周期、年度投资额、建设内容及建设方式。
(二)项目招投标方式、政府采购计划。
(三)项目建议书、选址规划、可行性研究、勘察、初步设计、咨询评估、编制相关规划、地面附着物清理等前期准备工作及相关费用。
(四)自筹资金到位情况。
(五)项目是否具备开工条件。
(六)其他需要报告的事项。
第六条 年度财政性投资项目预算一经下达,一般不得突破。如项目投资概算或预算控制价超过批复预算,需在项目开工报告中单独说明。项目投资概算、预算控制价超过批复预算100万元或超过批复预算30%的,需经市长办公会研究批准后实施。
第七条 财政性投资项目预算控制价由财政部门或委托有相应资质的中介机构编制。