某乡镇供水水厂工程施工组织设计
                               某水厂施工组织设计
County continuation records has examined and approved t。
                               某水厂施工组织设计
County continuation records has examined and approved the draft, spirit, believe, comprehensive Yearbook of zhuanglang already prepared draft, entered the phase of evaluation. Civil air defense work
County continuation records has examined and approved the draft, spirit, believe, comprehensive Yearbook of zhuanglang already prepared draft, entered the phase of evaluation. Civil air defense work2
某建筑安装有限公司
County continuation records has examined and approved the draft, spirit, believe, comprehensive Yearbook of zhuanglang already prepared draft, entered the phase of evaluation. Civil air defense work
(2)施工项目管理,通过对劳动、设备、材料、资金、技术、方案、时间与空间条件的优化配置,并通过自始自终对施工现场进行全过程严密监控,实施全方位动态管理,确保实现质量、工期、安全、成本及社会信誉的预期目标。
4、项目目标
(1)施工中按照“贯彻国标、规范管理、精心施工、优质服务、干一流工程,创一流形象”的质量方针进行施工,我们将响应业主和监理的全部要求,采取切实可行的措施,确保达到如下目标:
(2)质量目标:坚持“百年大计,质量第一”的方针,保证合格,争创优良。
(3)安全目标:杜绝伤亡事故,保证安全生产。
(4)文明施工:创文明施工规范工地。
(5)工期:确保120天内完工。
二、工程概况
资金来源:某水厂系民营资本和国债资金共同投资项目。
建设规模:新建2000m3/d规模水厂一座,主要项目有反应沉淀池、快滤池、清水池、二级泵房、围墙、厂区道路和仓库等。
三、施工准备计划
施工准备工作内容包括技术、生产、现场三个方面,要做到现场四
                               某水厂施工组织设计
County continuation records has examined and approved the draft, spirit, believe, comprehensive Yearbook of zhuanglang already prepared draft, entered the phase of evaluation. Civil air defense work
County continuation records has examined and approved the draft, spirit, believe, comprehensive Yearbook of zhuanglang already prepared draft, entered the phase of evaluation. Civil air defense work2
某建筑安装有限公司
County continuation records has examined and approved the draft, spirit, believe, comprehensive Yearbook of zhuanglang already prepared draft, entered the phase of evaluation. Civil air defense work
通一平,六落实,为此要做好以下几方面的工作:
1、平整场地:
采用人工平整,如遇高低差较大,采用机械平整,余土用翻斗车运到指定地点堆放,缺土用翻斗车从外地运到施工现场,人工回填。
2、技术准备
组织现场施工人员熟悉审查图纸,做好技术交