下载此文档

建筑工程合同管理流程.doc


文档分类:管理/人力资源 | 页数:约24页 举报非法文档有奖
1/24
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/24 下载此文档
文档列表 文档介绍
建筑工程合同管理流程
大唐万安
合同管理流程
编号:
版号:
页码:
several group number, then with b ± a, =c,c is is methyl b two verticale equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
流程目的
健全公司合同管理规范,规范公司合同管理程序,控制公司经营风险,提高合同审批效率。
适用范围
适用于公司项目开发涉及的经济技术合同(不包含银行贷款合同、其他融资合同、房屋销售合同、商业租赁合同、人事合同等)的管理工作。
流程责任人
经营部负责人。
术语和定义
合同经办部门:是合同起草、报审、签订的主责部门。
工程类合同——工程部/经营部
设计类合同——总工室/经营部
营销类合同——经营部
商业类合同——经营部
合同执行部门:是合同具体实施的执行部门,通常与合同经办部门相同,工程战略采购类合同除外。
大唐万安
合同管理流程
编号:
版号:
页码:
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as pr

建筑工程合同管理流程 来自淘豆网m.daumloan.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息
  • 页数24
  • 收藏数0 收藏
  • 顶次数0
  • 上传人文艺人生
  • 文件大小2.66 MB
  • 时间2022-04-07
最近更新