several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
二、招投标工作实施流程图
开 始
招标小组安排组织邀标单位进行现场踏勘察
招标小组组织答疑、澄清,业务部门提供技术支撑,综合部门提供后勤保障
各业务部门以书面形式汇总答疑问题,经公司办公会签字确认后返招标小组,招标小组汇总整理经同意后发放给所有领取招标文件的投标单位
由公司办公会据工程情况确定评标小组成员,招投标相关法律规定评标小组成员数量为5人〔含〕以上单数。
招标小组组织相关业务部门对投标单位所做样板工程进一步实地考察了解,写出书面考察报告〔需要时〕
投标单位按招标文件要求编制并报送投标文件到开标地点
招标管理小组组织开标会,综合部提供后勤保障
由评标小组成员按招标文件评标方法评定:确定中标候选单位进入二次商务谈判
招标小组汇总开评标相关资料并编写招投标书面报告,并提交公司办公会
由公司办公会对中标候选单位进行二次商务谈判(根据工程需要安排),依据商谈结果,或其他形式表决定标,推荐中标人
发出中〔未〕中标通知
结 束