汉东星都A-02号楼
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size工组织设计重点阐述了公司对本工程管理中的总体设想与部署以及主要采用的技术保障措施,内容包括严格遵循的国家标准、建筑行业标准及地方规定,结合我公司数十年成功的技术管理程序和施工方法及长期积累的施工经验,编制该工程各分局部项工程的施工作业方案与作业指导书,用以指导工程的施工和管理,确保优质高速、平安文明地完成建设任务。
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
1.3 编制依据
1.3.1 建设单位发送的本工程招标文件与招标图纸答疑。
1.3.2 根据建设单位提供的工程设计图。
1.3.3 本工程施工图纸中所需用的图集。
1.3.4 本工程施工图预算及工料分析的有关数据。
1.3.5 本公司数年来在