绿色矿山的建设
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Peaning of digital mines at home and abroad, the research significance, research status and existing problems, and discusses the future development trend of the digital mine.
Key words: green mining; Ecological construction; The sustainable development.
绿色矿山的概念
绿色矿山是指矿产资源开发全过程,既要严格实施科学有序的开采,又要对矿区及周边环境的扰动控制在环境可控制的范围内;对于必须破坏扰动的局部,应当通过科学合理的措施,确保矿山的存在、开展直至终结,始终与周边环境相协调,并融合于社会可持续开展轨道中崭新的矿业形象[1]。
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline