several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measuremengrid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured2
仅供参考
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
1.3 编制依据
1.3.1 建设单位发送的本工程招标文件与招标图纸答疑。
1.3.2 根据建设单位提供的工程设计图。
1.3.3 本工程施工图纸中所需用的图集。
1.3.4 本工程施工图预算及工料分析的有关数据。
1.3.5 本公司数年来在施工中逐渐积累的先进施工经验。
1.3.6 现场踏勘情况及周围环境的实际情况。
1.3.7 湖北省、随州市有关建筑工程管理、市政管理、环境保护等地方性法规。
1.3.8 我公司颁发的?质量手册?>、?程序文件?、?工程管理文件?及有关质量管理、平安管理、文明施工管理制度等相关支持性文件
1.3.9 中华人民共和国公布的现行建筑结构和建筑施工,设备安装施工的各类规程、标准及验收标准,依据建设部?工程建设标准强制性条文?的规定。
1.3.10 其它与该工程有关的重要文件等。
1.4 编制原那么
1.4.1 严格遵守现行的技术标准、施工规程和质量评定与验收标准。
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured102
仅供参考
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installat
汉东星都A-02号楼 来自淘豆网m.daumloan.com转载请标明出处.