施工日志和安全日志这样写
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate sispecific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
和下午分别记录。2、施工部位。施工部位应将分部、分项工程名称和轴线、楼层等写清楚。
3、出勤人数、操作负责人。出勤人数一定要分工种记录,并记录工人的总人数。
(二)工作
施工日志和安全日志这样写 来自淘豆网m.daumloan.com转载请标明出处.