下载此文档

基于集群划分的配电网多时间...布式有功-无功协同优化方法 赵晶晶.pdf


文档分类:通信/电子 | 页数:约11页 举报非法文档有奖
1/11
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/11 下载此文档
文档列表 文档介绍
: .
电测与仪表 IEEE33 节点系
统为例,验证了文章所提方法有效性。
关键词:分布式电源;集群划分;多时间尺度;有功-无功协同;同步交替方向乘子法
中图分类号:TM911 文献标识码:A 文章编号:1001-1390(2022)00-0000-00
Multi-timescale distributed active and reactive power coordinated optimi-
zation method of distributed network based on cluster division
Zhao Jingjing, Zhu Jiongda, Liu Shuai, Li Zibo, Du Ming
(School of Electrical Engineering, Shanghai University of Electric Power, Shanghai 200090, China)
Abstract: Large scale distributed generation (DG) connected into the distribution network (DN) increases the dif-
ficulty of DN to cope with the uncertainty and centralized control. Therefore, this paper proposes a mul-
ti-timescale distributed active-reactive coordinated optimization method based on DG cluster (DGC) of DN. At the
day-ahead level, a centralized active-reactive power coordinated optimization model is established to arrange the
power and start-stop plan of long-time adjustment equipment. Then, considering the influence of DG and load
forecast errors on voltage, a DGC cluster partition model is established based on day-ahead scheduling result. At
the intraday level, targeting the minimum of optimal cost and voltage deviation, a distributed active-reactive pow-
er coordinated optimization model is established based on DGC and SADMM, to revise the day-ahead power plan
of each continuous adjustment equipment. Finally, taking the IEEE33-node system as an example, the effective-
ness of the proposed method is verified.
Keywords: distributed generation, cluster partition, multi-timescale, active-reactive coordinated, SADMM
0 引 言 跟踪电力峰荷变化、不能对偏远地区进行理想供电

基于集群划分的配电网多时间...布式有功-无功协同优化方法 赵晶晶 来自淘豆网m.daumloan.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息
  • 页数11
  • 收藏数0 收藏
  • 顶次数0
  • 上传人好用的文档
  • 文件大小1.05 MB
  • 时间2022-06-22
最近更新