四、调度人员工作职责
1. 调度负责人职责
1. 1. 协调与组织各施工单位,保证各项施工的顺利进行。
1. 2. 负责监督检查各车站、各队伍及部门执行日班方案的情况。
1. 3. 及时组织预防和处理各种危及行车平安的因素,防止行车事故的发生。一旦发生事故,立即启动应急预案,配合救援领导小组开展施工救援。
2.行车调度员职责
2. 1. 积极配合调度负责人完成各项行车调度工作,在调度负责人的领导下编制列车运行图,正确、及时发布调度命令。
2. 2. 随时掌握所有机车、车辆的停留位置及动态状况、以及列车的运行状况,合理分析及组织车流、列流。
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical
最新调度工作管理办法 来自淘豆网m.daumloan.com转载请标明出处.