除灰除渣运行手册第三版(修改版)
PLTU 1 JAWA BARAT INDRAMAYU 3X330MW
COAL FIRED POWER PLANT
Ash & Slag Handling Operation Manual
Document Number: SCP-OM-05
Revised Edition: 3
Owner: PT PLN
Prepared by: EPC Contractor SCP JO
September 20, 2010
SINOMACH – CNEEC – PENTA JOINT OPERATION
序言
Preface
本《除灰、除渣系统运行手册》EEC-PENTA JOINT OPERATION委托陕西西北发电运行有限责任公司根据PLTU 1 JAWA BARAT INDRAMAYU 3X330MW COAL FIRED POWER PLANT PROJECT除灰、除渣设备制造厂提供的设备使用维护说明书和相关图纸编制的,仅适用于本项目运行操作。
Under the entrustment of SCP JO (EEC-PENTA JOINT OPERATION), the Ash & Slag Handling Operationt Manual is prepared by NWPOWER (Shaanxi Northwest Power Generation Operation Co., Ltd.) based on the O&M Instructions and associated drawings provided by ash and
slag handling equipment manufacturers. It is only suitable for the operations in PLTU 1 JAWA BARAT INDRAMAYU 3X330MW COAL FIRED POWER PLANT PROJECT.
a
SINOMACH – CNEEC – PENTA JOINT OPERATION
目录
Contents
序言............................................................................................................................... a Preface ............................................................................................................................... a
范围....................................................................................................................... 1 Scope .................................................................................................................... 1
引用标准................................................................................................................ 1 Quoted standards .................................................................................................. 1 概述...............................................................
除灰除渣运行手册第三版(修改版) 来自淘豆网m.daumloan.com转载请标明出处.