Spatial Site Survey Questionnaire
CUSTOMER NAME: Myanmar Ministry of Post & munications (MPT)
Global Telephone
CUSTOMER SITE: Yangon – existing S12 MSC site. Also includes 8650 SDM, 7500 SGSN, 5 BSCs, 3 TCs, 1 MFS, CG, old SGSN, old HLR
Shwe Gon Dine MPT building
1st Floor : Battery + Power Supply
2nd Floor: Equipment Room
.
CONTENTS
1 Environmental Considerations 3
Floor …………………………………………………………………………………….3
Ceiling 3
General Location Data 4
2 Site Survey Data Summary 5
Environmental Considerations
Floor
On what floor(s) will the equipment located? (For example, 1st, 2nd)
2nd
Is there a raised floor (false floor)?
If Yes, state how many inches high
Yes No
Tile Size: Width= Length= Thickness=
Net height of floor?(distance between ground and floor)
(Take measurements from several points to account for variation in floor.
What type of floor covering is laid?
Carpet Carpet Tiles
Concrete Other (please specify)
Is there enough space to move rack into switching room?
Yes No
to be measured space of stairs and doors.
Raised floor cable rack tile cutouts have been provided for power and signal / data cables.
Yes No rPower & cable racks provided
Ceiling
What is ceiling height?
Height= 5 m
Is there 10 feet minimum(3 meter) clearance in the area where the switch node is to be located?
Yes No
Is there a false ceiling (suspended)?
Yes No
General Location Data
This project is Initial Expansion.
Node Type is WSS WMG SGSN Other
This office is a Host Remote
If Remote office, what is Host?
Notes:
An audit of the power supply should be done. There is strong possibility that we will need to change the rectifiers.
For initial deployment; my suggestion is to install first: WCS, 1xWMG, XMC; potentially 3-4 racks.
in the old GGSN rack, there are some switches and working gear that must remain, but we can remove the old GGSN and use that space for our IT equipment.
Cust