运行规程
电气专业
Foreword
前言
This procedure is prepared for standardizing operational run to guarantee safe and economic operation of unit 2×600 MW . And this procedure is prepared basing on the reference like data, diagrams and manual from manufacturer, and also data from Designer , Installer and etc.
And this procedure is considerated as a working accordance for running missioning, and as a learning material for training program of recruits. After publication of this procedure, related technicians shall be familiar with this procedure. And this procedure is used for running missioning of equipments of 2×600MW Thermal Power Plant of ITPCL of India.
This es into force from the date of publication.
为保证2×600 MW机组安全、经济运行,规范运行操作,特制定本规程。本规程依据设备制造厂家资料、图纸、使用说明书,设计院、安装单位等资料编制。
本规程作为运行调试、操作的工作依据,有关技术、运行人员应熟知本规程,同时也作为新入厂员工上岗培训学习的资料。本规程适用于印度ITPCL 2X600MW燃煤电站项目2×600MW 机组设备的调试、运行。
本规程自发布之日起开始执行。
CONTENTS
目录
CHAPTER ONE OPERATION REGULATIONS FOR THE GENERATOR AND ITS EXCITATION SYSETM 1
第一篇发电机及其励磁系统运行规程 1
1 Overview 1
1 概述 1
2 Equipment specifications 1
2 设备规范 1
3 Operation rules of the generator 4
3发电机运行规定 4
4 Monitoring, inspection and maintenance during the operation of the generator 11
4 发电机运行中的监视、检查及维护 11
5 Start-up, paralleling and loading of the generator 14
5 发电机启动、并列、带负荷 14
6 Splitting and shutdown of the generator and maintenance during shutdown 18
6 发电机的解列、停机、停机期间的维护 18
7 Switching operations of the excitation system 20
7 励磁系统的切换操作 20
8 Operation and maintenance of enclosed busbar at the outlet of the generator 21
8 发电机出口封闭母线的运行与维护 21
9 Abnormality and accident handling of the generator 22
9 发电机异常及事故处理 22
CHAPTER TWO OPERATION REGULATIONS FOR THE TRANSFORMER 36
第二篇变压器运行规程 36
1 Overview 36
1 概述 36
2 Equipment specifications 36
2 设备规范 36
3 Operation rules of the transformer 39
3 变压器的运行规定 39
4 Monitoring and inspection during normal operation of the transformer 44
4 变压器正常运行监视、检查 44
5 Input and Shutdown of the transformer 48
5 变压器的投
600MW电气运行规程 来自淘豆网m.daumloan.com转载请标明出处.