下载此文档

2003年11月CATTI三级笔译实务真题(附答案).doc


文档分类:资格/认证考试 | 页数:约5页 举报非法文档有奖
1/5
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/5 下载此文档
文档列表 文档介绍
2004年5月英语三级笔译实务试题
Section 1 English-Chinese Translation (英译汉) (60 points)
Translate the following passage into Chinese. The time for this section is 120 minutes.
Passage 1
If you have never seen a power plant, you might find it hard to imagine how plex the equipment is or how much heat is generated by the boilers or how much coal it takes to fuel the furnaces for just one day.
During the course of a day, the boilers at one of our power plants, Morgantown, for example, can turn 24 million gallons of water into steam. That generating plant alone uses 9,900 tons of coal in its furnaces in just one day. Potomac Electric pany (PEPCO) uses so much coal that we have purchased two 80-car unit trains to facilitate the delivery process. And Morgantown alone can produce over 25 million kilowatt-hours of electricity in a single day's operation.
Electricity is produced by spinning large s inside a coil of wire within the generator. The faster we spin the s, the higher will be the voltage of the electricity produced. Electricity leaves a PEPCO generator at between 13,800 and 24,000 volts.
The next step in the process occurs when electricity passes through a transformer where the voltage is stepped up to continue on its journey. A transmission wire is like a small diameter pipe. Stepping up the voltage is like increasing water pressure, thus speeding the flow of energy through the

2003年11月CATTI三级笔译实务真题(附答案) 来自淘豆网m.daumloan.com转载请标明出处.

非法内容举报中心
文档信息
  • 页数5
  • 收藏数0 收藏
  • 顶次数0
  • 上传人rdwiirh
  • 文件大小39 KB
  • 时间2018-08-13
最近更新