英文缩写中英文对照表
缩写说明
Metrics:
HR Dept.:
: Lost Work Day Case Rate
Quality Dept.:
COQ: Cost of Quality (质量成本)
WIR: Wiring Incident Report (配线报告)
FTQ: First Time Quality (
WFCC: Worldwide Formal Customer Complaint (所有客户正式的反馈)
PPM: Pieces per Million (一百万产品)
RRPPM: Return & Reject Piece Per Million (不合格部品多少钱)
IPTV: Incident Per Thousand Vehicles (运输中发生的事故部品)
Engineering Dept.:
C/O: Changeover time (对策转变时间)
C/T: Cycle Time (周期时间)
PDT: Planned Downtime (计划停产期)
LT: Lost Time (损失时间)
DT: Downtime (停产期)
OA: Operational Availability (操作可行性)
OE: Operational Effectiveness(效力的可行性)
PC&L Dept.:
OEM: On time Shipments (及时出货)
IPM: Incident Per Million (事故损失的钱数)
E&O: Excess & Obsolete (超额完成&荒废的)
PRR: Problem Resolving Request (问题分析请求)
MU: Material Utilization (材料的利用)
Others:
Tpct: Total Production Cycle Time (整体生产周期)
MCR: Material Cost Reduction (材料成本的精简)
6SIGMA
DMAIC: Define, Measure, Analysis, Improve, Control
VOC: Voice of Customer
CTQ: Critical to Quality
SIPOC: Supplier, Input, Process, Output, Customer
I&CIM: Innovation, & Continuos Improvement
TMAP: Though Map
PMAP: Process Map
MSE: Measure System Evaluation
FMEA: Failure Modes and Effects Analysis
NEM: Numerical Evaluation of Metrics
ANOVA: Analysis of Variance
TPS: Toyota Production System
10. SMED: Single Minutes of Exchange Die
12. FIFO: First In First Out
5S: Clear (Sort), Organize ( Straighten), Clean(Sweep), Maintain (Standardize), Continuous Improvement ( Sustain)
NWG: Natural Work Group
WIP: Work In Process
PFEP: Plant For Every Part
JIT: Just in Time
PDCA: Plan – Do – Check – Action
SQIP: Supplier Quality Improvement Process
VOC: Voice of Customer
MSDS: Material Safety Date Sheets
PDP: Product Development Process
PTC: Protect The Customer
APQP: Advanced Product Quality Planning
SPDP: S
英文缩写中英文对照表 来自淘豆网m.daumloan.com转载请标明出处.