下载此文档

超高层消防工程施工措施.doc


文档分类:建筑/环境 | 页数:约6页 举报非法文档有奖
1/6
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/6 下载此文档
文档列表 文档介绍
of rural drinking water sources, protection of drinking water sources in rural areas by the end of the delimitation of the scope of protection, complete with warning signs, isolating network protection facilities
of rural drinking water sources, protection of drinking water sources in rural areas by the end of the delimitation of the scope of protection, complete with warning signs, isolating network protection facilities
of rural drinking water sources, protection of drinking water sources in rural areas by the end of the delimitation of the scope of protection, complete with warning signs, isolating network protection facilities
一、超高层消防工程施工特点难点
(一)工程特点
本标段施工场地狭窄、楼层高,对于现场材料和交通布置以及施工队伍安排提出了相应的要求。超高层施工、现场布置和施工队伍部署是本工程施工组织最大的难点,由此增加了环境、工期和安全管理的难度。
1、施工技术、工程质量要求高
本标段是超高层,内部设施完备、技术先进、装修水准高。消防安装工程只有达到高质量标准,才能保证设施的可靠性、安全性及建筑、安装、装饰三者的整体美观与协调。
2、工程地处城区,施工场地狭窄
本标段地处城区繁华地区,材料进出运输受到一定的限制,如,像钢管、角钢这类体长材料。场地狭窄,楼层高,施工队伍多,材料二次搬运受到一定限制,主要协调总包单位垂直运输工具搬运。
3消防工程施工配合量大、面广、时间长
安装工程高峰期与土建、机电、弱电、电梯、装饰工程等单位施工交叉作业量大、时间长,施工协调工作量大。
该工程分布在楼面、墙体及吊顶天花内水、电气管线多而繁杂,吊顶内空间小。预留预埋套管、线管线盒的清理需要协调土建;设于吊顶内的穿线、配管、报警设备安装、喷淋头安装必须紧密配合二次装修、机电、弱电等工作进行。
安装工程后期主要与装修工程交叉作业多、时间长,消防喷淋头、烟温感探测器的水平标高与装饰吊顶、灯具配合要求高,要达到整体美观一致。
整个住宅楼内各类系统多、管线工程量大、线路交错复杂,安装各专业只有紧密配合、综合协调、分清先后施工顺序,才能有条不紊地进行安装。
由于是超高层、使用垂直施工电梯上下班、材料搬运等待造成施工时间浪费,故使本工程工期相对紧张。
塔楼上部结构为单元房标准层,因装饰为精装修,有利于样板区及组织标准化施工和开展施工竞赛;因此可着重从保证地下室和塔楼立管管道、穿线、喷头、报警探头安装施工工期入手,