下载此文档

pmp报名项目经验描述模板.doc


文档分类:管理/人力资源 | 页数:约2页 举报非法文档有奖
1/2
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/2 下载此文档
文档列表 文档介绍
: .
To realize the equipment life cycle management, optimize the equipment utilization.
IN: Develop project scopes and objectives; write the bidding document. PL: Open tender; design the system architecture; make project plan.
EX: Demand investigation; system detailed design; time control; check whether the system functions to meet the needs of users. MC: Feedback problem; risk management.
CL: Check the archiving documents; complete the online test run and final acceptance.
Project activities : Project completed on schedule. Meet user needs.
Project objective: Implement a new website to trace the vendors ' working hours and generate the monthly report.
IN: Define the project scope; Identify risks;
obtain approval from stakeholders.
PL: Prepare the project plan and develop the work breakdown structure.
EX: Manage physical move; Manage communication.
MC: Hold daily stand-up meeting; Manage changes to scope, schedule.
CL: Final acceptance from customer; Deliver trainings; Archive the documents.
Production issues are fixed in time. Functions added. No budget exceed.
The goal of the project is to provide soluti

pmp报名项目经验描述模板 来自淘豆网m.daumloan.com转载请标明出处.

非法内容举报中心
文档信息
  • 页数2
  • 收藏数0 收藏
  • 顶次数0
  • 上传人shijijielong001
  • 文件大小16 KB
  • 时间2021-10-17