Page 1/ 6 ments Form H12 81/ 3/4/5/6 – 40, 000 DWT Bulk Carrier Plan Title ARR ’T OF MANHOLE Plan History Plan No. FH201004FB Rev No. A Buyer Ref. No. Date Builder Ref. No. Date Buyer ’s No. Rev No. MENTS Reply ments . 28 Drawing Status ment Status 2 MENTS Reply ments 2. 10 A Approved Revised Drawing Required MENTS Reply ments 2. 14 B Approved subject men ts and subject to Class approva l Revised Partial Drawing Requir ed 4 MENTS Reply 4 ments 2. 28 C Not approved. S ment s. Number of ments 5 MENTS R Noted No. BUYER ’MENTS BUYER ’S IN ITIALS BUILDER ’S REPLY STATUS Page 2/ 6 No. BUYER ’MENTS BUYER ’S IN ITIALS BUILDER ’S REPLY STATUS 1 a) : please to add in the drawings of the man hole details of each different type (dimension, nu mber, weight, packing (min 5 mm),stud bolts and material) . Please to consider that the manhole cover tobe provided with hand grip a) Accepted See “ Detail of Hull Outfitting, FH901070FB ” P age G1 ~ G17 CLOSED b) Thanks, Accept b) Noted & thanks c) c) 2 a) : p lease each manhole shall be provided of the name of partment tobe written oni tby welding bead with paint (please suppluy us the dimension of the mark) a) Same as above (point ) CLOSED b) Thanks, Accept b) Noted & thanks c) c) Page 3/ 6 No. BUYER ’MENTS BUYER ’S IN ITIALS BUILDER ’S REPLY STATUS 3 a
H1281 散货船人孔退审意见书 来自淘豆网m.daumloan.com转载请标明出处.