several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured2
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
安全环保工作简报
安全环保部 第4期 2013年4月20日
* 1月22日下午,公司安委会全体成员、各分厂生产厂长、安环部管理人员参加了中国化工集团公司SHE工作电视电话会议和中国昊华化工集团股份有限公司安委会电视电话会议。与会同志在集团公司SHE工作会议上认真听取了中国化工集团公司关于2013年1月份3起生产安全事故及2012年安全环保事故情况的通报、对集团公司2013年SHE工作的部署及任建新总经理的讲话;在吴华公司安委会上认真听取了胡冬晨总经理的讲话。自2012年下半年以来,中国化工集
安全环保工作简报2013.4 来自淘豆网m.daumloan.com转载请标明出处.