several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measuremenrtical box center line distance for a,, to b vertical box distance for b, list can measured
学习文档 仅供参考
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
六、接到地质灾害险情报告时,根据实际情况,及时发动受到地质灾害威胁的职工以及其他人员转移到安全地带;情况紧急时,必须采取强制措施组织避灾疏散,同时将受灾情况上报经信委。
七、主管单位接到企业和个人发现地质灾害险情或灾情的报告后,立即转报政府,同时组织人员到现场核实,及时核实情况并逐级上报。
八、地质灾害发生后,企业必须及时将灾情及其发展趋势以信息形式一日一报。
九、各企业应配合人民政府做好地质灾害防治、治理以及防灾救灾工作。
各企业必须按照责任书要求,认真开展本辖区范围地质灾害防治工作,尽可能减少地质灾害造成的人民生命财产损失。
十、经责令限期整改后逾期不改正,造成公民人身伤害、公私财产损失,或者严重威胁公民人身安全、公私财产安全或者公共安全的,除给予处罚外,还可建议有关组织对企业主要负责人和其他直接责任人员依法给予行政处分;情节严重,构成犯罪的,依法追究责任。
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. F
地质灾害防治责任书 来自淘豆网m.daumloan.com转载请标明出处.