下载此文档

沙建 虎山森林防火隔离带(防火通道)工程(投标)施工组织设计 secret.doc


文档分类:建筑/环境 | 页数:约82页 举报非法文档有奖
1/82
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/82 下载此文档
文档列表 文档介绍
沙建 虎山森林防火隔离带(防火通道)工程(投标)施工组织设计_secretseveral group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measuremen术标的编制,一切建立在对工程周边环境详细调查研究、对招标文件深刻理解的基础上,同时考虑多种施工工艺等,做到方案编制切合工程实际、有针对性,有目的性。
4、一切从保障工程高速、优质、安全地完成,保证山林防火安全、周边地面道路、保证地区环境的角度出发编制,本工程技术标书的原则。
5、坚持积极推广“四新”成果的原则:在各工序的施工中,对于能够提高工程质量、进度、降低成本的新技术、新工艺、新设备,积极地采用推广,提高工程施工的科技含量。
6、坚持专业化作业和综合管理相结合的原则:施工组织方面,发挥专业施工队伍的优势,同时采用综合管理手段,合理调配,到达整体优化,保证工程施工进度、质量、安全目标全面实现的目的。

several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured- 2 -
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured- 49 -
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box dis

沙建 虎山森林防火隔离带(防火通道)工程(投标)施工组织设计 secret 来自淘豆网m.daumloan.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息
  • 页数82
  • 收藏数0 收藏
  • 顶次数0
  • 上传人沧桑一梦
  • 文件大小316 KB
  • 时间2022-02-12