simulation and optimization of industrial fcc units using a 4-lump ic model论文.pdf
: . 1. to an for fuThistur epermits needs. the Ri calculationyadh cCollegeity, ofca thepofita rateEngineering,l of of th cokee Ki nformationgdKingom oSaudf thusSaud Universitydecreasingi Arabia, i sthe in degreeth e pro ofcess empiricism of devel oinpin g the entThe M aidatantenan fromce sixMan differentagement industrialSysteRiyadhm (unitsPM11421, M isS) used Saudifo r thine Arabia thecit ysimulation street netw. oItrk was. Pa foundveme thatnt d atheta cmodelollectio n resultsand areeva inlu agoodtion agreementis one of with the thesys correspondingtem's main co plantmpo s. ThePave modelment predictsconditio thatn in theclude unitsd s truarect operatedural capaci at ty, the rostaticallyughnes s,stable visu ahighl co ndititemperatureon survey steady and stateskid whereasresistan useStru ofctur thea 3-lumpl capac kineticity dat amodel was in det previousermine dwork usin g a predictedDynatest that Ftheallin unitsg W eoperateight D ate fl theecto middlemeter unstable(FWD). steadyRoughn mThiseasur showsement thes we importancere coll ect eofd the usin structureg May's of Rid e the Mkineticeter (MRMmodel ).used Visual for theco nditideterminationon survey of thein vo stabilvedli dtyeve characteristicsloping a di s trofess these eval importantuati on fo industrialrm. The in Theclud ed (Received 6 May 1997; accepted for publication 15 November 1997) modeltyp e,is usedde ntosit yfind and the seveoptimumrity ofoperating the co conditionsmmon ty pande o fthe di soptimumtress fo un performanced in the n eistwo comparedrk. Skid with res ithesta nce industrialmeasu were coll ected using Mu meter. The main objectives of thi s paper are to describe th e procedures used to coll ect pavement condition data an
simulation and optimization of industrial fcc units using a 4-lump ic model论文 来自淘豆网m.daumloan.com转载请标明出处.