建设工程全过程跟踪审计和结算审计
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurat及省、市造价管理部门有关规定。
二、工程全过程跟踪控制审计实施办法及指导文献
1、《风险管理与内部审计》由我公司董事长周和生编写第二章“建设工程的风险管理与跟踪审计”,该书已作为国家内部审计协会和中国教育审计学会的培训教材。
2、“高校建设工程跟踪审计指南” (正在征求意见)由我公司董事长周和生先生起草,拟由“中国教育审计学会”发文,作为全国高校建设工程跟
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured- 29 -
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
施工单位提交送审资料报监理公司
审计处接收资料,制定计划,委托跟踪审计机构
基建处签署意见报审计处
监理公司提交意见报基建处
七、跟踪审计流程 (适用于国有资金建设项目)