水利工程师个人工作总结
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate sizáͬ־£¬×ðÖØÁìµ¼£¬Ô²ÂúµØÍê³ÉÉϼ¶½»¸øµÄ¸÷ÏîÈÎÎñ£¬¼á³Ö ¸öÈËÀûÒæ·þ´Óµ¥Î»ÀûÒæµÄÔÔò£¬ ²»¼Æ½Ï¸öÈËÃûÀûµÃʧ¡£ ¹¤×÷×÷·çÑϽ÷һ˿²»¹¶£¬ ¾«ÒæÇ󾫣¬ÇÚ·ÜÎñʵ¡£±£³Ö½¡¿µÐÄ̬£¬»ý¼«½øÈ¡£¬ÀÖ¹ÛÏòÉÏ£¬¶ÔË®ÀûÊÂÒµºÍµ¥ λǰ;³äÂúÐÅÐÄ¡£ Ò»¡¢ÔÚ¹¤×÷ÖÐ×¢ÖØѧϰ£¬Äܼ°Ê±Ñ§Ï°ÕÆÎÕм¼Êõ¡¢ÐÂ֪ʶ¡¢Ð±ê×¼¹æ·¶£¬ ±ãÔÚ¹¤×÷ÖмÓÒÔÓ¦Ó㬼á³Ö¸ù¾Ý¹¤×÷ÐèҪѧϰ£¬½«Ñ§µ½µÄ¼¼Êõ¼°Ê¹ÓÃÓõ½Êµ¼Ê ¹¤×÷ÖÐÈ¥£¬Ê¹×Ô¼ºµÄÒµÎñˮƽµÃµ½Ìá¸ß£¬¾ß±¸½ÏÇ¿µÄÒµÎñ¹¤×÷ÄÜÁ¦£¬Äܸù¾Ý¹¤ ×÷ÐèÒª£¬·þ´ÓÁìµ¼µÄ°²ÅÅ£¬´Óʶà¸ö¸ÚλÉϵļ¼Êõ¹¤×÷¡£ÔÚ±±¸ÉÇþÈýÃæ¹â·ÀÉø ¹¤³ÌÊ©¹¤ÖУ¬ÎÒ×÷Ϊ¹¤³Ì¼¼ÊõÐÖúÈËÔ±£¬¸ºÔð·ÖÅäÇþ¶ÎµÄÊ©¹¤ºÍÖÊÁ¿¼à¶½£¬¿¢ ¹¤×ÊÁÏÕûÀí¹¤×÷¡£ ¶þ¡¢Ð¡Ë®¿â³ýÏÕ¼Ó¹ÌÉè¼Æ ¸ù¾Ý¹¤³Ì½á¹¹¸´ÔÓ¡¢¹¤Æڶ̵ÄÌص㣬³ä·Ö·¢»Ó ×Ô¼ºµÄÒµÎñר³¤£¬ºÏÀí¹æ»®¹¤ÆÚ¡¢¾«È·Öƶ¨×ÊÔ´¼Æ»®¡¢È·¶¨Ê©¹¤·½°¸¡¢»ý¼«ÍÆ ¹ãм¼Êõ¡¢Ð¹¤ÒÕ¡¢Ð²ÄÁÏÓ¦Ó㬸ù¤³Ì±»ÆÀΪÓÅÐ㹤³Ì¡£Ê©¹¤ÄѶȽϴó£¬×÷ Ϊ¸ÃÏîÄ¿µÄ¼¼Êõ¸ºÔðÈË£¬ÎÒÔÚÊ©¹¤¹ý³ÌÖв»¶Ï½øÈ¡¡¢¿Ì¿à×êÑС¢ÐéÐÄÇë½Ì£¬»ý ¼«ÐÖúÏÖ³¡Ê©¹¤ÈËÔ±½â¾ö¸÷ÖÖÊ©¹¤¹ý³ÌÖÐÓöµ½µÄ¼¼ÊõÄÑÌ⣬ ÉîÈë¹á³¹ ISO9002 ÖÊÁ¿Ìåϵ±ê×¼£¬Ñϸñ°´ÕÕ¹«Ë¾ÖÊÁ¿¹ÜÀí³ÌÐò×é֯ʩ¹¤£¬Ê¹¹¤³ÌÖÊÁ¿¡¢°²È«¡¢¹¤ ÆÚ¾ùÑϸñ°´ÕÕºÏͬҪÇóʵʩÍê³É£¬¸ÃÏîÄ¿ÈÙ»ñºÓ±±Ê¡Ê¡¼¶ÎÄÃ÷¹¤µØ¡¢ºÓ±±Ê¡¿Æ
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors
水利工程师个人工作总结 来自淘豆网m.daumloan.com转载请标明出处.