研究解决卡封压裂砂堵的新方法— 1—前言通过多年的开发, 濮城油田油井套管老化问题严重, 同时油藏补孔合采情况比较突出,纵向上含油井段长、油层多、层间差异大,采用卡封护套、卡封分层压裂工艺可以保护套管免受损伤、实现层层压开的目的, 充分挖潜次主力层的生产潜力。在卡封压裂过程中, 由于近井摩阻高、裂缝发育形态复杂等问题, 会造成压裂时砂堵导致施工失败。多年来, 我们油田一直采用先活动管柱解封, 无效后用大修工艺的方法来处理砂堵问题, 虽然砂堵问题能够得到解决, 但是存在着施工周期长、作业成本高等诸多问题。随着油田作业成本日益紧张, 研究解决卡封压裂砂堵问题的新方法亟待得到实施。砂堵是由于地层天然微裂缝发育, 滤失严重或近井筒弯曲摩阻大而造成压裂砂无法全部进入地层, 沉积在管柱内, 增加下步工序的施工难度,影响压裂后的及时见效。— 2—一、小组概况······························································· 1 二、选题理由······························································· 2 三、设定目标······························································· 3 四、对策方案的提出并确定最佳方案································ 3 五、制定对策······························································· 7 六、对策实施······························································· 8 七、效果检查····························································· 14 八、标准化································································ 16 九、总结和今后的打算················································· 17 目录— 1—一、小组概况(表 1)小组概况小组名称工艺所 QC小组注册编号采二 QC2007-02 课题名称研究解决卡封压裂砂堵的新方法成立时间 2006 年10月课题类型创新型活动时间 2007 年1月—12月小组人数 10人当年活动次数 20次活动出勤率 100% QC教育学时 110 学时/人获奖情况中原油田 QC成果一等奖(表 2)QC小组成员简介序号姓名年龄文化程度职务(职称)组内分工备注 1刘伟 34 大学厂长组长、全面负责 2 陈传东 40 大学副厂长方案策划、组织协调 3 史长平 39 大学所长方案策划、研制设计 4李丽 34 大专工程师资料收集整理 5郭东 33 大专工程师研制设计、现场实施 6 吕栓柱 39 大学副所长现场实施、研制设计 7 方玉斌 36 大学高工现场实施 8刘涛 36 成专助理现场实施 9 张宗轩 32 成专助理效果检查 10李健 35 大学工程师现场实施— 2—二、选题理由濮城油田 200 6年 1-1 2 月共有5 口卡封压裂井出现砂堵问题后上大修处理: (表 3) 2006 年卡封压裂砂堵井调查统计表序号井号施工日期压裂方式设计砂量(m 3) 管柱余砂(m 3) 处理方式处理时间( 小时) 费用(万元) 1 W51-211 卡封分层 大修 168 2 XW51-2 卡封分层 大修 216 3 W98-22 卡封护套 大修 190 4 7-137 卡封分层 大修 144 5 V355-4 卡封分层 大修 192 合计 910 平均 182 制表时间: 2007 年1月制表人:李丽图1 选题理由折线图生产现状存在问题调查得知, 2006 年解决卡封压裂砂堵增加作业费用 万元, 平均单井增加作业时间 182 小时。随着油井套管老化、层间矛盾的日益突出, 卡封压裂工作量会逐年增多, 因此, 处理卡封压裂砂堵的方法急待解决。课题目前应用的解决方法, 作业时间长、成本高, 急需寻找一种高效率、低成本的解决方法, 来更好地解决卡封压裂砂堵问题。研究解决卡封压裂砂堵的新方法— 3—三、设定目
解决卡封压裂砂堵的新办法(新) 来自淘豆网m.daumloan.com转载请标明出处.