ParkWorks + The Downtown Cleveland Alliance
CLEVELAND PUBLIC SQUARE
DESIGN james corner field operationsBIG THINKING FOR A BIG PROBLEM:
1) MAKE IT A DESTINATION
2) MAKE IT ACTIVE
3) MAKE IT GREEN
4) MAKE IT FLEXIBLE
james corner field operationsASSUMPTIONS
ROADWAYS REMAIN UNCHANGED
ONLY ONTARIO IS SHOWN AS EITHER PERIODICALLY OR
FULLY CLOSED
CURRENT TRANSIT SYSTEM AND DROP-OFF/PICK-UP STOPS
RETAINED
OBVIOUSLY, THERE ARE MORE POSSIBILITIES IF ROADWAYS
ARE NARROWED, REDUCED, OR CLOSED, AND IF TRANSIT IS
REVISED – ANY SUCH RECOMMENDATIONS WOULD REQUIRE
MORE STUDY AND ANALYSIS
james corner field operations“FOREST“FOREST CITY”CITY” “PUBLIC“PUBLIC SQUARE”SQUARE”
CUYAHOGACUYAHOGA VALLEYVALLEY EVEVENTFUL,ENTFUL, SOCIALSOCIAL
ARBOREALARBOREAL CCHARACTERHARACTER CIVICCIVIC CELEBRATIONCELEBRATION SPACESPACE
ENGINEERINGENGINEERING STRUCTURESSTRUCTURES TOPOGRAPHITOPOGRAPHICC CHARACTERCHARACTER
james corner field operationsSCENARIO #1
james corner field operationsVIEWVIEW FROMFROM 200200 PUBLICPUBLIC SQUARESQUARE
james corner field operationsSCENARIO #1SCENARIO LAYERS
james corner field operationsSITE SECTION AT ONTARIOPROGRAM AREASVEHICULAR CIRCULATIONPEDESTRIAN CIRCULATIONPERFORMATIVE STRUCTURES
james corner field operationsSCENARIO #2
james corner field operationsSCENARIO #2SECTION AT ONTRAIOAMBIENT ENVIRONMENTS
james corner field operationsSCENARIO #3
james corner field operationsSCENARIO #3
(ONTARIO CLOSED)SC
国外一广场景观设计方案 来自淘豆网m.daumloan.com转载请标明出处.