下载此文档

触摸屏测试方法.doc


文档分类:通信/电子 | 页数:约10页 举报非法文档有奖
1/10
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/10 下载此文档
文档列表 文档介绍
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel cler cement ratio. Concrete mix pour from a stirring end to the construction site should be less than hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head


to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain t

触摸屏测试方法 来自淘豆网m.daumloan.com转载请标明出处.

非法内容举报中心
文档信息
  • 页数10
  • 收藏数0 收藏
  • 顶次数0
  • 上传人buxiangzhid56
  • 文件大小4.95 MB
  • 时间2022-06-03
最近更新