下载此文档

Pieceworkmanagementapproach计件管理办法.doc


文档分类:管理/人力资源 | 页数:约6页 举报非法文档有奖
1/6
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/6 下载此文档
文档列表 文档介绍
Piecework management approach (计件管理办法)
Zeroth part catalogue
0. 1 the first part of the piecework system is illustrate more advantages, avoid the negative impact of disadvantage, the manager has the conduct of ongoing training for employees, on the other hand, to strengthen the management skills and methods, to avoid the limitation of management for employees, and bring their corresponding loss.
The second part is about the standard of piecework
1 in order not to conflict with the "People's Republic of China labor law”, at the same time more efficiently and improve the working enthusiasm of staff, set piece work standard, unified use of manufacturing industry reference method of trial operation accounting.
2 piece standard hours accounting method:
2. 1 is calculated on 365 days a year, 52 Sunday, 52 Saturday, 11 vacation days, and 265-52*2-10=251 days:
2. 2. 2 monthly salary according to Shenzhen minimum wage standard 700 yuan / month:
2. the standard monthly working hours are 251 days, /12 months, = days / month:
2. 2. 4 works 8 hours a day, and the salary is 33. 46 yuan. The hourly salary should be =4. 18 yuan;
2. 2. 5 monthly plan for more than 168 hours outside of the piece production according to 1: piece rate wage calculation, such as the production of A products, when the yield is 1000 and the price was 0. 00418 yuan, the production should b

Pieceworkmanagementapproach计件管理办法 来自淘豆网m.daumloan.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息
  • 页数6
  • 收藏数0 收藏
  • 顶次数0
  • 上传人蓝天
  • 文件大小85 KB
  • 时间2022-06-09