Housing construction practice summary report of the 2008-06-03 1:22 architecture is a canding, foundation reinforcement
Binding must first lofting, each span reinforced joint number only 25%, namely 4 reinforced only one joint, in addition, the joint
Try to put in the compression zone. In the process of building walls, such as when the wall corner or intersection, two wall to be built in together.
In the process of stubble, can stay inclined to stay straight Cha Cha, if you must leave, Yang Cha, and have a tie bar, not to leave Yin cha. In
The process for concrete construction, with special attention to the concrete mix, in the heat of the day to pay attention to the maintenance and so on. On the construction site
What one sees and hears, more inspired me to love and longing of the profession, but also deeply appreciate the need to make a difference in the construction industry
Must pay more efforts, not only in theory, but in practical application. At the same time, I also deeply appreciate a
A responsibility, hope that through their own efforts, for the construction of the motherland Tim brick tile, realize their own value.
Below I will process the contents of this internship report as follows:
In practice.
Practice content: relevant regulations study countries, understand the various engineering program by reading:
The drawings, un