several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measuremen绩
计算机
成绩
知识产权
创新知识培训成绩
主要
社会
兼职
二、主要学历:〔从中学写起〕
起讫时间
学校、专业
学历、学位
备注
三、专业进修经历:
起讫时间
学校、学科
学时
备注
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
四、工作经历:〔按不同岗位、专业职务、行政职务分别填报〕
起讫时间
单位名称
部门、岗位
行政职务
专业职务
五、专业工作小结:
提示:1、任助理工程师前的重要业绩,约500字;
最新申报工程师自荐综合材料 来自淘豆网m.daumloan.com转载请标明出处.