江苏现代路桥有限责任公司 沪宁高速公路〔江苏段〕养护工程路面专项维修工程HNGS-LM01合同段
several group number, then w029
表5 拟投入本合同段主体施工队伍资历表……………………066
表6 拟投入本合同工程的主要施工机械表……………………068
表7 拟配备本合同工程主要的材料试验、测量、质检
仪器设备表…………………………………………………………070
表8近五年已完类似工程经历表
表9在建工程主要情况表
E、资施工组织设计………………………………………………081
1、主要工程工程的施工方案、施工方法
2、设备、材料采购运输实施方案
3、确保工程质量和工期的措施
4、质量、平安保证体系
5、其它应说明的事项
江苏现代路桥有限责任公司 沪宁高速公路〔江苏段〕养护工程路面专项维修工程HNGS-LM01合同段
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured2
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is