33-PCE-QP-TRG-01.doc


文档分类:管理/人力资源 | 页数:约6页 举报非法文档有奖
1/6
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/6
文档列表 文档介绍
PYRAMID CONSTRUCTION ENGINEERING ( PTE ) LTD
QUALITY PROCEDURE
DOC. NO. : PCE-QP-TRG-01
REV. : A
SHEET : 1 OF 6
EFFECTIVE DATE –18/10/97
TITLE: TRAINING
Rev. #
Description of Change
Clause #
A
Initial Release
.
Prepared By
MANAGER, ADMINISTRATION DEPT
(Signature) (Designation) (Date)
Reviewed By
MANAGER, ADMINISTRATION DEPT
(Signature) (Designation) (Date)
Approved By
MANAGEMENT REPRESENTATIVE
(Signature) (Designation) (Date)
PYRAMID CONSTRUCTION ENGINEERING ( PTE ) LTD
QUALITY PROCEDURE
DOC. NO. : PCE-QP-TRG-01
REV. : A
SHEET : 2 OF 6
TITLE: TRAINING
1. Purpose: To define the procedure for identifying the training needs and providing for the training of all personnel performing activities affecting quality.
2. Scope: This procedure applies to the personnel overseeing training need of staff performing activities affecting quality.
3. Reference: Nil
4. Responsibility

All Heads of Department are responsible for reviewing the training need to the individual staffs. The respective Manager is responsible for the execution of the training and maintain the training record.
5. Procedure:
Circumstances Leading to the Need of Training
Technological Change;
Deversification of Business;
Major changes are introduced into Quality System;
Increase of Individual Responsibility / Job Enrichment / Job Enlargement;
New Technology, Machines / Equipme

33-PCE-QP-TRG-01 来自淘豆网m.daumloan.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息