下载此文档

深圳前海片区开发时序分析.docx


文档分类:通信/电子 | 页数:约73页 举报非法文档有奖
1/73
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/73 下载此文档
文档列表 文档介绍
Abstract
With the acceleration of the urbanization process in China, the development of new towns and new districts has entered prehensive construction period. Shenzhen Qianhai district, a new area was reclaimed from the sea, which construction has caused great attention to government departments and munity's strong concern not only because that economic important responsibility on the Pearl River delta regional but also for the special role in Institutional mechanism innovation.
The new invitation of concept schemes for the Qianhai district has recruited all over the world and the government provided 5 billion RMB for the best one as a reward. And at last, the one named “Qianhai water city” which is featured by the water gallery won petition. The urban construction is a dynamic process, while the urban design is always a static process showed by paper-made blueprint. In the concrete construction process, how to arrange project construction sequence to the implementation of the urban design result, is the key issues to realize the goal and are always the ignorance for urban designer.
Urban operation theory has revealed that land can be managed as special merchandise and will pletely different numbers of e according to the different time it was transferred. The new city construction will need a lot of money in infrastructure construction. It should ensure good shape space as well as getting the biggest revenue from the land transferring progress, in which way can offer better conditions for new construction. And it is also the key concern of government.
Combine with the present way we do to determine the time sequence of construction, the method can be divided into two parts: functionally based and index based system. Based on the understanding of these two methods, I propound my own methods of time sequence for Qianhai district. There are three steps: first choose the point, second weigh the growth, then make sure the construction sequence, which are fundamental

深圳前海片区开发时序分析 来自淘豆网m.daumloan.com转载请标明出处.

非法内容举报中心
文档信息
  • 页数73
  • 收藏数0 收藏
  • 顶次数0
  • 上传人wz_198613
  • 文件大小2.37 MB
  • 时间2018-07-16
最近更新