1信号工程施工安全操作规程中铁电气化局集团有限公司二O一二年八月2目录1、一般规定········································12、光电缆线路及贯通地线····························23、地面固定信号····································24、转辙装置········································35、轨道电路及轨旁设备······························66、驼峰机械设备····································97、车载信号·······································108、箱式机房·······································109、室内设备·······································1310、信号设备防雷接地······························1311、系统调试······································31312、营业线施工过渡·······························1413、营业线系统开通································:。,未和设计单位沟通擅自更改设备型号、配线和施工标准。,未调查既有图纸和设备的型号、配线是否一致。。、开通方案不合理,未按批准的方案实施。或超出计划施工范围和施工时间进行施工,未制定应急预案。。。、坑等动土施工前未对地下设施进行调查,监护人员未到场擅自施工。,信号电压混电或接地。、设备型号、设备配线错误或与竣工图纸不一致。。。。,设备边缘和身体侵入接触网安全距离。、材料放置侵限或使轨道电路短路。、更换钢轨绝缘时未登记要点和工务配合;电力牵引区段更换轨道设备需断开轨道牵引回流通路时,未执行先通后断原则。,道岔调整各项指标未达到要求。,轨道、信号机、道岔等室外设备未按标准程序逐项核对。,未对既有设备进行可靠防护。。,确认实物与图纸是否相符。,采用封连线或其他手段封连使用中的各种信号设备电气接点。、列控及列车调度指挥/调度集中等系统未试验或试验不彻底。。,设备管理单位监护人员未到位,擅自施工。,可能造成分路不良的轨道区段未登记。,未按规定设置驻站联络员和现场安全防护员。,施工人员未按规定穿戴安全防护用品。。,在轨面上放置石子等影响行车安全的物品。,钻孔位置必须在钢轨的腰部中心位置,孔距符合标准要求,必须进行倒角处理。,更换正在使用中的信号设备。,擅自更改信号联锁条件恢复信号设备使用。、敷设、地下接续等隐蔽工程施工,站场改造过程中影响行车和既有设备安全的联锁修改、过渡开通等施工项目为重大危险源,应制定专项施工方案,并按规定进行审批或备案。在涉及重大危险源施工时,施工单位专职安全管理人员应进行现场指导,监理单位应进行旁站监理,设备管理单位应进行现场监护。《铁路营业线施工安全管理办法》(铁办[2008]190号)的相关规定。人员和设备进入机械室前应按有关规定办理登记手续。、工具物品放置在道岔、钢轨以及其他任何妨碍行车安全的地点,防止材
信号工程安全操作规程. 来自淘豆网m.daumloan.com转载请标明出处.