several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measuremenhe vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured2
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured6-13
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
目 录
水力机械…………………………………………………………6-3
电工……………………………………………………………6-10
金属结构………………………………………………………6-23
通风空调………………………………………………………6-26
附表……………………………………………………………6-27
附 图 目 录
序 号
图 名
图 号
1
技术供水系统图
-1-01
2
消防供水系统图
-1-02
3
检修及渗漏排水系统图
-1-03
4
高压压缩空气系统图
-1-04
5
低压压缩空气系统图
-1-05
6
水力监测系统图
-1-06
7
厂房通风空调系统图
-1-07
8
电站接入电力系统地理位置接线图
-1-01
9
电气主接线方案比较图
DZ101B
汕头市澄海区莲阳桥闸重建初设报告6 来自淘豆网m.daumloan.com转载请标明出处.