行政后勤管理工作流程
行政后勤管理工作流程
several group number, then with b ± a, =c,c is is methyl b two vertical box between of acclevel points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured12
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
行政后勤部
1、编制文件字号并办理发文登记后发布文件
2、将文件的电子版、纸质版及《发文审批表》等相关文件归档、保存
注:
1、本流程适用于集团公司一级(管理手册)、二级(程序)、三级(规章、制度)文件的编制和发布管理,行政后勤部为文件管理责任部门。其它文件,如各类通知,管理部门报总裁或主管副总裁批准后即可发布,不需填写《发文审批表》及编号。
2、行文规定:
(1)公文的文种主要包括决议、决定、指示、公报、通知、通报、规定、报告、请示、批示、会议纪要、函等。
行政后勤管理工作流程
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points gri
行政后勤管理工作流程 来自淘豆网m.daumloan.com转载请标明出处.