several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measuremen那么多工业工程相关的课程了,他才突然冒出来,说起来应该是老幺了,可是,下一届的学弟学妹们却又在未学习其他课程之前将它学习了。好吧!按照先来后到的顺序,在我这里,他就是老幺吧!工业工程这个大家族里,就目前为此,该认识的大哥们,我都已经做了相应的了解与认识,在老师的眼里,算是懂了些皮毛,当然,我也不会自以为是的自吹自擂自己掌握了多少,但我还是有信心大声说自己是一名合格的工业工程专业毕业的学生,毕竟,课堂上可不是白去的,老师的教导大部分还是深深地进入了我的脑海里。对于工业工程导论这门老幺课程,只是可惜了,对它的认识恐怕就更加浅薄了,由于这是一门补选课程,由于其他课程上课时间冲突,就只能选择免听了,不知错过了老师多少精彩的讲义啊!但可能也说不定,毕竟它大哥们我都有所了解了,就算自己看,同一个妈生的,多多少少存在着相通的地方,理解起来应该不会感觉太专业的。
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level
工业工程导论论文 (2) 来自淘豆网m.daumloan.com转载请标明出处.