下载此文档

FMEA培训-Define the scope for the FMEA(ppt 44)英文版.ppt


文档分类:建筑/环境 | 页数:约44页 举报非法文档有奖
1/44
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/44 下载此文档
文档列表 文档介绍
FMEA Steps
1 Define the scope for the FMEA
2 Identify team members, customer, and knowledge experts
3 Develop roles and responsibilities for team members
4 Study the product / process / service
5 Develop rating scales for Severity, Occurrence, and Detection
6 Brainstorm failure modes, known and potential
7 List the effects, causes, and current controls for each failure mode
8 Assign ratings for Severity, Occurrence, and Detection
9 Calculate RPN
10 Decide on a threshold RPN
11 Prioritize based on RPN and severity, or as required by the customer
12 Identify corrective actions
13 Implement and verify effectiveness of corrective action
plete the documentation
1 Define the scope for the FMEA
Define the boundaries within which the product, process, or service will be
studied, identifying the operating assumptions, current conditions, and
constraints if any.
Example 1: Conduct a Process FMEA on PCB manufacturing line 1, starting with
operation 10 and ending with operation 250.
The assumption is that design of parts is correct, and no shortages
The line is setup as shown in process flow drawing # 809901
Example 2: Conduct Design FMEA on the pressure relief valve (Part #JJJKKK)
for potential failures under extreme operating conditions
Assume no preventive maintenance will be conducted once installed

Document on the FMEA startup form
FMEA; Step by Step
Scope of the FMEA
Points to consider:
Who are the customers for the FMEA, and what are their requirements / expectations
Example: Conduct (Process) FMEA on the assembly line for Product A, covering operations 110 through 230
When will this FMEA be plete under the given conditions (Remember, FMEAs are considered living documents, as such they need to be updated / revised as things change.)
Example: FMEA will be plete when the team has implemented all corrective actions as agreed upon based on the RPN threshold
This will form the basis for deciding the level at which you should conduct
the FMEA, and

FMEA培训-Define the scope for the FMEA(ppt 44)英文版 来自淘豆网m.daumloan.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息
  • 页数44
  • 收藏数0 收藏
  • 顶次数0
  • 上传人changjinlai
  • 文件大小723 KB
  • 时间2017-12-04