长沙市地铁1号线人民路车站施工方案设计
摘要
长沙地铁1号线一期工程从汽车北站到万家丽路站,呈南北走向,从汽车北站到芙蓉路,穿越浏阳河后,到达营盘路,后面改走黄兴路,然后与长沙地铁2号线相交于五一广场,之后继续向南走,最后到达了万家丽路。
人民路车站位于黄兴路步行街和人民路交叉处的北边,车站所处的位置是长沙市最为繁华的商业地段,在人流密集、商铺繁多的步行商业街处修建地铁车站,既要使周边建筑保持稳定和确保步行商业区的交通正常运行,同时保证在有限的空间内提供施工场地条件,是长沙市地铁1号线20座车站中距离周边建筑、最近施工条件最复杂的车站之一。
本站设计主要是对地铁车站进行车站主体结构进行设计,其设计内容包括:车站主体结构设计,车站防水设计,车站的施工方案设计,施工组织设计和基坑支护设计。
车站采用地下两层岛式站台,施工采用盖挖逆筑法施工,支护结构采用地下连续墙支护。
关键词:地铁车站;主体结构设计;盖挖逆筑法;地下连续墙支护;防水设计
CHANGSHA CITY PEOPLE'S ROAD, METRO LINE 1 STATION CONSTRUCTION SCHEME AND DESIGN
ABSTRACT
Changsha Metro Line 1, a project to Wanjiali from North Station Road Station, north-south direction, from North Station to Furong, after crossing the Liuyang River to reach Camp Road, behind the change to go Huangxinglu, then with Changsha Metro Line 2 line intersect at Wuyi Square, then continue to go south, and finally arrived Wanjiali Road.
Renmin Road station is located Huangxing Street and north of the intersection of Renmin Road, is the location of the station in Changsha most mercial area, in the crowded, commercial pedestrian street with many shops at the construction of subway stations, both to make the surrounding buildings remain stability and to ensure normal operation of pedestrian traffic downtown, while ensuring that the limited space available at the construction site conditions, Changsha City Metro Line 20 stations surrounding buildings in the distance, the recent construction of the station one of the plex conditions.
Site designed mainly for subway stations, the main station structure design, the design includes: the main structure of the station design, waterproof design station, the station's construction design, construction design and excavation design.
Stop using the underground layers island platform, using the cover construction dig inverted construction, supporting structure using underground continuous wall supports.
Key words: subway station; body structure design; cover excavation construction method; underground continu